宁乡县楚江中游项目区崩岗治理中水利工程设计(含CAD图)
来源:56doc.com 资料编号:5D14450 资料等级:★★★★★ %E8%B5%84%E6%96%99%E7%BC%96%E5%8F%B7%EF%BC%9A5D14450
资料以网页介绍的为准,下载后不会有水印.资料仅供学习参考之用. 密 保 惠 帮助
资料介绍
宁乡县楚江中游项目区崩岗治理中水利工程设计(含CAD图)(选题审批表,任务书,开题报告,中期检查表,论文21800字,CAD图纸6张合一)
CHUJIANG MIDDLE REACHES PROJECT IN NINGXIANG COUNTRY COLLAPSE MANAGMENT OF WATER CONSERVANCY PROJECT ENGINEERINGDESIGN
摘 要:本次崩岗治理设计是针对宁乡县楚江中游项目区出现中小型崩岗及水土流失较为严重的区域,对部分不稳定的山体进行整治,以此达到水土保持的目的。主要包括对面积较大的崩岗进行分梯级治理,根据地形上、下设置截排水沟,根据崩岗形状设置挡土墙、谷坊及开发成梯田等,对于集雨面积较大且植被稀疏地域采取封育补植措施。本次设计从技术和经济上是可行的。
关键词:挡土墙;截排水沟;谷坊;崩壁台阶
Abstract:The collapse in the management design is for regulating the ChuJiang middle reaches project in NingXiang country that exists small and medium-sized collapse and the area where there is a serious water and soil loss ,and part of the mountain unstable to keep soil and water conservation..Mainly including controlling the large area of collapse by points cascade and setting section drain according to the topography. To set the check dam and retaining wall and develop into terrace according to the collapse shape. To take the measures of enclosure for plant for the rainwater-collecting area and sparse vegetation region. The design is technologyly and economyily feasible. Key words: retaining wall;Section drain;check dam ;Collapse steps wall
项目区概况
1.1.1 地理位置、范围、面积
湖南省宁乡县楚江中游项目区位于宁乡县中北部,地处东经112°2′至112°13′,北纬28°1′至28°5′,总面积106.52km2。项目区涉及流沙河、老粮仓2个乡镇16个村。
项目区总人口5.71万人,农业人口5.42万人,农村劳动力3.71万个,农业人均耕地0.08hm2,农业人均收入4034元。
项目区成土母岩为花岗岩,土壤以强风化花岗岩土质为主,含砂量达60%,属砂类土。现有林地植被乔、灌、草兼有,经济植被以油茶、马尾松、杉、竹为主。
目 录
摘要 1
关键词 1
1 综合说明 2
1.1 项目区概况 2
1.2 建设概况 7
2 项目区自然条件 8
2.1 地貌、地质 8
2.2 水文、气象 8
2.3 土壤、植被 9
3 治理概况 10
4 建设意义及总体布置 12
4.1 建设意义 12
4.2 措施配置 12
4.3 工程规模 13
5 工程设计 17
5.1 土地整治工程 17
5.2 拦挡工程 20
5.3 排水工程 26
5.4 林草工程 34
5.5 封育治理工程 44
6 结论 44
致谢 44
参考文献 44
|