化工尾水深度处理工程设计(含CAD图)(任务书,开题报告,外文翻译,计算说明书12000字,CAD图15张)
摘要
近年来,我国在化工废水处理新技术研发方面取得了较大进展,但与国外发达国家相比,仍存在很大差距,尤其在复杂化工废水深度处理与中水回用方面。本设计选择合成橡胶工业尾水为研究对象,参考《橡胶制品工业污染物排放标准》(GB27632-2011)[1],确定待处理尾水各项水质指标。出水水质指标要求达到《城市污水再生利用-城市杂用水水质》(GB/T18920-2002)[2]标准。通过对进水水质特性进行分析,考虑处理目标要实现BOD、COD、TN、TP以及色度的降低,同时包括悬浮物的去除,选择物理、化学、生物相结合的方法,确定尾水处理方案为混凝沉淀→水解酸化→曝气生物滤池→Fenton氧化→活性炭吸附。根据回用的具体用途,有时还需增加消毒工艺。其中混凝沉淀主要去除水中的悬浮物,降低色度,并通过投加药剂实现除磷;水解酸化主要为增强污水可生化性;生物滤池、氧化及吸附用于去除BOD、COD等溶解态有机物,脱氮在曝气生物滤池中进行。水处理工艺过程产生的污泥采用混合处理,经重力浓缩后集中于贮泥池,再经带式压滤机脱水,最终外运。经以上处理工艺,污水水质可得到一定程度改善。但更高效的处理工艺还有待开发,加快实污水资源化的进程。
关键词:橡胶尾水 深度处理 回用 污泥处置
Engineering design of chemical tail water depth
treatment
Abstract
In recent years, China has made in research and development of new technologies Wastewater Treatment substantial progress, but compared with developed countries, there is still a big gap, especially in complex chemical wastewater treatment and water reuse aspect. This design choice tailrace synthetic rubber industry as the research object, refer to "rubber products industry emission standards" (GB27632-2011), pending determination of the tail water quality indicators. Water quality indicators required to achieve "urban recycling - urban miscellaneous water quality" (GB / T18920-2002) standards. Through the analysis of water quality characteristics, consider treatment goals to achieve BOD, COD, TN, TP and reduced chromaticity, while including the removal of suspended solids, select the physical, chemical, biological combination of methods to determine the end of treatment program of coagulation sedimentation, hydrolysis acidification,biological aerated filter,Fenton oxidation and activated carbon adsorption.Where in the coagulating sedimentation mainly to remove suspended solids and reduce the color and to achieve phosphorus removal by adding agents; hydrolysis acidification mainly to enhance the biodegradability of sewage; biofilter, oxidation and adsorption for the removal of BOD, COD, etc. dissolved organic matter, nitrogen carried out at BAF. Sludge treatment processes produce hybrid process, after gravity concentration focused on the sludge storage tank, and then dehydrated by belt filter press, finally Sinotrans. After the above treatment process, the sewage water quality improved to some extent can be obtained. However, more efficient processing technology yet to be developed, to accelerate the process of real water resource.
Keywords:Rubber tail water; Advanced Treatment; Recycling;Sludge Disposal
设计概况
1.1进水水质指标
目前,化工行业已成为江苏省经济发展的支柱产业,通过查阅近年来江苏省各化工企业的发展现状及其对省内经济的贡献率,选定合成橡胶工业尾水为本课题的研究对象。合成橡胶主要包括顺丁橡胶和丁苯橡胶。根据文献,以清水为对照,用美国HP5890 15970型气象色谱/色质联用仪(GC/MS)分析顺丁橡胶废水、丁苯橡胶废水的有机成分。测试结果表明:在橡胶废水中共发现25种有机物,对25种有机物中含量较高的18种有机物进行定量分析,发现2种废水均以苯乙烯为主要成分,分别占18种有机物的51.5%(顺丁橡胶废水)和78.8%(丁苯橡胶废水)[3]。
目录
摘要 I
Abstract II
第一章 设计概况 1
1.1进水水质指标 1
1.2出水水质要求 1
第二章 方案确定 2
2.1水质特性分析 2
2.2方案比选 2
第三章 污水处理构筑物设计 4
3.1配水井 4
3.1.1设计要求 4
3.1.2设计计算 4
3.2混凝 6
3.2.1混凝剂及投加 6
3.2.2工艺比选 8
3.2.3设计参数 9
3.2.4设计计算 9
3.3沉淀 12
3.3.1工艺比选 12
3.3.2设计参数 13
3.3.3设计计算 13
3.4水解酸化池 14
3.5过滤 16
3.5.1工艺比选 16
3.5.2设计参数 16
3.5.3设计计算 17
3.6 Fenton氧化 21
3.6.1方案比选 21
3.6.2设计计算 22
3.7活性炭吸附 24
3.7.1方案比选 24
3.7.2设计参数 26
3.7.3设计计算 26
3.7.4活性炭再生 27
第四章 污泥处理构筑物设计 29
4.1污泥处理工艺 29
4.2混合池 29
4.3浓缩池 30
4.4贮泥池 32
4.5污泥脱水 32
第五章 高程计算 35
5.1 高程布置 35
5.2 高程计算 35
第六章 投资预算与运行成本分析 37
6.1变配电系统 37
6.2投资及运行费用 37
6.2.1直接费用 37
6.2.2间接费用 39
6.2.3税金 39
6.2.4总投资 39
6.3污水处理厂运行注意事项 39
参考文献 40
|