摘要
该酒店加建区域建筑总面积:合计3301㎡,负一层的面积是335.5㎡,1F至5F的总面积2965.7㎡。此酒店建筑结构为地下一层,地上五层。本次设计内容包含了电气照明系统的设计,0.4KV配电的设计,建筑防雷接地系统及等电位联结系统的设计。在本次设计中,所有的照明设备均在T8型高效率荧光灯、节能灯、LED灯等低能耗光源中合理选择并使用,在控制方式上采用集中与分散相结合,合理利用自然光照,选择利用系数法进行照度计算合理分布灯具,保证每个房间的照度符合要求。0.4KV配电系统选择放射式与树干式结合的方式。从市政网络引入两路10kV高压电源拉进变配电室,接线方式:高压侧母线不联络,低压侧母线分段接入。经过防雷计算确定该建筑为二级防雷建筑,所以在做防雷布置时,热度锌扁钢作为本次防雷的主要材质,并主要利用建筑内的两根主钢筋作为防雷引下线,低压保护接地与防雷接地合并为同一根接地线,总等电位联结点设置在总配电箱处。
关键词: 酒店 照明设计 0.4kv供配电 防雷接地与等电位联结
High and Low Voltage Power Distribution Design Of Hotel
Abstract
The total construction area of the additional building area of the hotel: 3,301 square meters, 335.5 square meters for the negative floor and 2965.7 square meters for the 1F to 5F. This hotel has one floor underground and five floors above ground. This design includes the design of electric lighting system, the design of 0.4kv power distribution, the design of lightning protection grounding system and equipotential connection system. In this design, all lighting in type T8 high efficiency fluorescent lamp, energy-saving lamps, LED lamp in low energy sources such as reasonable selection and use, on the control method adopts the principles of combining centralization and decentralization, reasonable use of natural light, selecting coefficient method is used for illumination calculation of reasonable distribution of lamps and lanterns, ensure that accords with a requirement of each room illumination. 0.4kv power distribution system adopts the combination of radial type and trunk type. Two 10kV high-voltage power sources were introduced into the transformer room from the municipal network. The connection mode was: the bus on the high-voltage side was disconnected, and the bus on the low-voltage side was connected in sections. After calculate and determine the lightning protection of buildings for secondary lightning protection, lightning protection is decorated so doing, flat heat zinc as the main material of the lightning protection, and the main use of the building two main reinforcement as lightning protection downlead, low voltage protection grounding and lightning protection grounding combined into the same ground, total equipotential join points set in the total distribution box.
Keyword: Hotel lighting design 0.4kv power supply distribution lightning protection grounding and equipotential connection
2工程简介
本工程总建筑面积:3301平方米,其中地下面积为335.5平方米,地上面积2965.7平方米。地下一层,地上五层。加建区域房间性质以标准间为主,配有储藏间、服务间等。建筑高度为22.77米(屋顶最高处到地面垂直距离)。
目录
摘要 II
Abstract III
第一章 绪论 6
1.1设计题目和工程介绍 6
1.1.1设计题目 6
1.1.2工程简介 6
1.2设计依据和设计程序 6
1.2.1设计依据 6
1.2.2设计步骤 6
1.3设计任务及范围 7
第二章 照明系统 8
2.1 照明分类 8
2.1.1供电方式 8
2.1.2应急照明灯具布置 8
2.1.3应急灯具控制方式 9
2.2照明灯具计算 9
2.2.1灯具光源并选型 9
2.2.2照明的设计标准 10
2.2.3计算主要房间的灯具数量 11
2.2.4照度校验 17
2.2.5照度计算表 17
第三章 低压配电设计 24
3.1方案设计 24
3.1.1负荷分级 24
3.1.2供电电源与方式 24
3.1.2供电方式的比较与分析 24
3.2低压配电负荷计算公式 25
3.3照明负荷 25
3.3.1 照明配电系统设计原则 26
3.3.2 需要系数法计算负荷 26
3.4断路器的选择 29
3.5电缆的选择 30
3.5.1.材料选择 30
3.5.2.导线截面,管径 30
3.6无功功率补偿 32
3.7短路电流计算 33
3.7.1.计算公式 33
3.7.2. 计算结果 34
3.7.3短路电流稳定性校验 35
3.8 断路器电缆及配电表 36
第四章 防雷与接地设计 41
4.1防雷分类 41
4.2防雷与接地措施 42
总结 43
参考文献 44